[ HBs & TMs ]
 3. ECSS TMs made available
 __Engineering TMs
 __Product Assurance TMs
[ My Settings ]
  Question to the ECSS Helpdesk
  Register
  Why register and login
  Log In
[ Search ]
 
  Glossary of Terms

             
   


Foreword for each ECSS Technical Memorandum

This document is one of the series of ECSS Technical Memoranda. Its Technical Memorandum status indicates that it is a non-normative document providing useful information to the space systems developers’ community on a specific subject. It is made available to record and present non-normative data, which are not relevant for a Standard or a Handbook. Note that these data are non-normative even if expressed in the language normally used for requirements.
Therefore, a Technical Memorandum is not considered by ECSS as suitable for direct use in Invitation To Tender (ITT) or business agreements for space systems development.

Disclaimer

ECSS does not provide any warranty whatsoever, whether expressed, implied, or statutory, including, but not limited to, any warranty of merchantability or fitness for a particular purpose or any warranty that the contents of the item are error-free. In no respect shall ECSS incur any liability for any damages, including, but not limited to, direct, indirect, special, or consequential damages arising out of, resulting from, or in any way connected to the use of this Standard, whether or not based upon warranty, business agreement, tort, or otherwise; whether or not injury was sustained by persons or property or otherwise; and whether or not loss was sustained from, or arose out of, the results of, the item, or any services that may be provided by ECSS.



By downloading ECSS documents from this site, you agree to the terms and conditions of the ECSS License Agreement / Disclaimer.
If you do not agree with such terms and conditions do not download the files.

Following ECSS Technical Memoranda are made available (click on hyperlink to access documents).

ECSS-E-TM-10-10A

Logistics engineering

16 April 2010

ECSS-E-TM-10-20A

Product data exchange

16 April 2010

ECSS-E-TM-10-21A

System modelling and simulation

16 April 2010

ECSS-Q-TM-40-04 Part 1A

Sneak analysis: Principles and requirements

16 April 2010

ECSS-Q-TM-40-04 Part 2A

Sneak analysis: Clue list

16 April 2010

ECSS-Q-TM-70-51A

Termination of optical fibres

16 April 2010